Public Transport

Resource requirement for SUMNet & (Seven) partner cities

Technical Study of the existing BRTS corridor for the last mile connectivity and pre-feasibility of potential electrification of the corridor, Rajkot

FLEET long range planning tool for STUs

National Bus Resource Requirement Estimation

BEAD (BRTS Evaluation And Design Tool)

BRT Design Summary Report

Which BRT do we need- Sandeep Gandhi

Comparative Evaluation of Alternate Bus Rapid Transit System (BRTS) Planning, Operation and Design Options- Sandeep Gandhi

Share/ Transport in India- Threats, Challenges and Opportunities- Sandeep Gandhi

Bus Terminal Design Guideline

Bus Depot Design Guidelines

BRT Corridor- Proposed Parking and Circulation Plan