Urban Mass Transit Company Pvt. Ltd. (UMTC)

Pune BRTS Corridor (Phase 3)

Pune has one of the most ambitious BRTS Network development plan of any Indian city. As of 2017, 2 Phases have been completed in the Pune BRTS and the 3Rd Phase is under construction. The project involved preparation of general alignment drawings (GAD), good for construction (GFC) drawings and including signal planning for three BRTS Corridors for Pune Municipal Corporation, totalling 15.5 km. The tasks included site studies to formulate design solution, development of conceptual alignment with bus shelter locations, preparation of GAD drawings, analysis of infrastructure and operations design alternatives in BEAD Tool, development of cross section designs and detailed junction design, signal phasing (a total of 30 intersections) and designing and development of final good for construction drawings. Additionally, the project team developed detailed bill of quantities (BoQ), specifications, assisted in bid process as well procurement process and co-ordinated with the Pune Municipal Corporation with the execution of the project. The project team also developed all typical construction details, signage and pavement marking drawings. The contractor is appointed, and the project execution is currently on-going at site.

The three BRT corridors planned in this project were:

  • Corridor 1: Sadalbaba –Bombay Sappers–Vishrantwadi; 4.7 km
  • Corridor 2: Yerwada –Kharadi ; 7.8 km
  • Corridor 3: Sadalbaba – Sangamwadi ; 3.0 km
MEET OUR TEAM

Download All Reports