Urban Mass Transit Company Pvt. Ltd. (UMTC)

Pune BRT Corridor (Phase 2) 

The project involved preparation of general alignment drawings (GAD), good for construction (GFC) drawings, and signal planning for three BRTS Corridors for Pune Municipal Corporation, totalling 35.5 km. The tasks included site studies to formulate design solution, development of conceptual corridor alignment with bus shelter locations, preparation of GAD drawings, development of cross section designs and detailed junction design, signal phasing and designing, and development of final good for construction drawings.

The three corridors for this phase of BRT Development in Pune were:

  • Nagar Road
  • Alandi Road
  • Sangamwadi Road

 