Ahluwalia Contracts India Ltd
This project involves reviewing of the existing DPR to identify the data gaps, including any validation gaps. Data collection through primary surveys were taken place followed by Data Analysis. Preparation of conceptual traffic circulation was done to get the final traffic and mobility plan for CSMT. Traffic demand and capacity report were then developed considering the studies done, submitted, reviewed and finalised with the clients.